Free Range - 3/4 Inch Nylon Training Leash - for Large and Medium Dogs - Long Lead with Handle - Great for Training, Play, Camping, or Backyard (50 Ft, Orange)

Free Range - 3/4 Inch Nylon Training Leash - for Large and Medium Dogs - Long Lead with Handle - Great for Training, Play, Camping, or Backyard (50 Ft, Orange)

50 Foot / Max Grip - Orange
$43.55
Sale price  $43.55 Regular price  $0.00
Skip to product information
Free Range - 3/4 Inch Nylon Training Leash - for Large and Medium Dogs - Long Lead with Handle - Great for Training, Play, Camping, or Backyard (50 Ft, Orange)

Free Range - 3/4 Inch Nylon Training Leash - for Large and Medium Dogs - Long Lead with Handle - Great for Training, Play, Camping, or Backyard (50 Ft, Orange)

$43.55
Sale price  $43.55 Regular price  $0.00
Size50 Foot
ColorMax Grip - Orange

Product description

Trainer Handle

The classic trainer handle is ideal for fully-trained dogs and peaceful environments

Max Comfort Handle

The max comfort handle gives you more control without sacrificing comfort thanks to an extra layer of padding.

Max Grip Handle

The max grip handle allows you to hold on as tight as you need. Great for pups who pull and busy urban settings

Velcro Coil System

Easily roll up and stow unused slack using the integrated velcro coil system.

  • ULTRA DURABLE TRAINING LEAD: This long leash for dog training is made from strong, durable nylon that is softer and stronger than cotton leashes. Perfect for training, outdoor activities, and even the beach!
  • COMFORT AND EASE: Unlike polypropylene leashes, our long leash for dogs outside doesn't have sharp edges that could scrape your hands while reeling in. All stitching is reinforced and the nickel plated clip swivels to resist twisting or tangling.
  • CHOOSE YOUR HANDLE: Our extra long dog leash is available with a sturdy foam handle for ultimate comfort, a rubber molded handle for a strong grip with dogs that pull, or a standard nylon handle for lightweight on-the-go travel.
  • VERSATILE USE: A great training leash for large dogs or medium dogs for off-leash dog training or training in the backyard. As well as for hiking, camping, training, hunting, recall training, outdoor play with tennis balls, and swimming!
  • GREAT FOR ANY BREED: Whether you need a puppy training leash for small dogs or more control over a medium or large dog, our leads are perfect for any pup. Available in lengths between 15 and 100 ft, simply clip to their Leash Boss collar or harness!

You may also like